Analisis Efektivitas Line Cubing 2 dengan Menggunakan Metode Overall Equipment Effectiveness di PT. BM
DOI:
https://doi.org/10.37090/indstrk.v8i2.1202Abstract
PT. BM is a food seasoning company. One of its superior products is seasoning cubes. In the production process, seasoning cubes are found in cubing line 2. From the research results, cubing line 2 has problems that impact the high level of product defects and downtime. This research aims to analyze the OEE calculation online cubing 2 with the aim of increasing effectiveness and finding the root cause of the problem. Research methods involve problem identification, observation, literature study, data collection and analysis, discussion, recommendations for improvement, conclusions, and suggestions. The data was analyzed using OEE calculations and the root cause of the problem was identified using fishbone diagram analysis. Recommended improvements include setting brass as the standard bushing material, as well as carrying out preventive maintenance every 6 months. It is hoped that the implementation of these improvements can increase overall production effectiveness at PT. BM.
Keywords: Availability Rate, Effectiveness, Overall Equipment Effectiveness, Performance Rate, Quality Rate.
References
Aprialdo, M., & Nurul Azizah, F. (2023). Perhitungan Overall Equipment Effectiveness (OEE) untuk Mengetahui Efektivitas Mesin Produksi di PT. Z. Industrika: Jurnal Ilmiah Teknik Industri, 7(2), 103–113.
Aryanto Balol, W. (2017). Analisa Perhitungan Overall Equipment Effectiveness (OEE) untuk Meningkatankan Availibility dan Performance pada Mesin Filling di PT SC. Jurnal Ilmu-Ilmu Teknik, 13(1), 71–75.
Aswan, D. (2020). Overall Equipment Effectiveness (OEE) pada Hasil Produksi Mesin Packing Wafer di PT. XYZ. JITEKH, 8(1), 27–33.
Fleischer, J., Weismann, U., & Niggeschmidt, S. (2006). Calculation and optimisation model for costs and effects of availability relevant service elements. ResearchGate, 675–680.
Harits Trysnawan Amaanullah, M., Sandora, R., & Sidi, P. (2018). Perencanaan Total Productive Maintenance (TPM) untuk Meningkatkan Produktivitas Stasiun Gilingan pada PG. Kebon Agung. Proceeding 1st Conference on Safety Engineering and Its Application, 1(1), 373–378.
Hendra, F., Effendi, R., & Eko, K. (2016). Perhitungan Overall Equipment Effectiveness (OEE) untuk Alat Berat Pemeliharaan Jalan Rel PT. Kereta Api. Sintek Jurnal, 10(1).
Huda, S., & Munir, M. (2018). Implementasi 5R+1S Sebagai Upaya Peningkatan Efektivitas Produksi dengan Metode Overall Equipment Effectiveness (OEE) di PT. Coca-Cola Bottling Indonesia. JKIE (Journal Knowledge Industrial Engineering), 3, 11–18. http://jurnal.yudharta.ac.id/v2/index.php/jkie
Karmilawati, E. K., Mulyono, K. M., & Nugroho, S. N. (2021). Pendekatan OEE (Overall Equipment Effectiveness) Untuk Mengurangi Losses Pada Mesin Moulding Cerex. Jurnal Optimasi Teknik Industri (JOTI), 3(2), 46. https://doi.org/10.30998/joti.v3i2.8576
Nafis, M., Wiwin, K., & Herlina, W. (2018). Analisis Perhitungan Nilai Overall Equipment Effectiveness (OEE) pada Mesin Wrapping di Perusahaan Biskuit Dan Wafer PT. Unimos.
Nakajima, S. (1988). Intoduction to TPM. Productivity Press.
Priyono, S., Machfud, M., & Maulana, A. (2019). Penerapan Total Productive Maintenance (TPM) Pada Pabrik Gula Rafinasi di Indonesia (Studi Kasus: PT. XYZ). Jurnal Aplikasi Bisnis Dan Manajemen. https://doi.org/10.17358/jabm.5.2.265
Sibarani, A. A., Muhammad, K., & Yanti, A. (2020). Analisis Total Productive Maintenance Mesin Wrapping Line 4 Menggunkan Overall Equipment Effectiveness dan Six Big Losses di PT XY, Cirebon - Jawa Barat. Jurnal Rekayasa Sistem & Industri (JRSI), 82. https://doi.org/10.25124/jrsi.v7i2.425
Sundari, S., & Wahyono, H. (2021). Pengukuran Produktivitas Mesin Tetas Telur Dengan Metode Overall Equipment Effectiveness (OEE) di PT. Malindo Feedmill. Tbk. Industrika: Jurnal Ilmiah Teknik Industri, 4(1), 51–65.
Tri Maulida, F., & Primasanti, Y. (2023). Analisis Kinerja Mesin Two For One (TFO) Terhadap Efisiensi Produksi di Industri Tekstil Menggunakan OEE Dan FMEA. 273–280. https://conference.unisnu.ac.id/scitech/semprotek23
Wahid, A., Munir, M., Misbah, A., & Pusakaningwati, A. (2022). Mengukur Efektifitas Mesin Chenyueh Menggunakan Overall Equipment Effectiveness (OEE) dan Six Big Losses pada CV. Abi Surabaya. Journal of Industrial View, 4(1), 31–39.
Downloads
Published
Issue
Section
License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.