OPTIMALISASI WAKTU DAN BIAYA PROYEK DENGAN METODE CPM DAN PERT DI PROYEK ABC CONDOTEL

Authors

  • Putri Endah Suwarni Program Studi Teknik Industri Fakultas Teknik Universitas Tulang Bawang Lampung

DOI:

https://doi.org/10.37090/indstrk.v3i1.125

Abstract

Planning until controlling process during construction work are important activity of a project. Success or failing of the project caused by not maximal planning and insufficiently effective controlling, so that the project activity is inefficient. As the consequences of these impacts suffered project delay, decreasing of quality, and increasing performing cost. Project management working time drew the line by given schedule, so the manager of project shall get to anticipate condition changing. CPM and PERT methods can be used to manage the time of project completion more efficiently and effectively. To be able to reduce the impact of delays and swelling of project costs, a crashing process can be proposed with additional working hours. Duration acceleration is carried out on the work that is on the critical path because the work on the critical path does not have a delay time. With the addition of working hours besides being able to shorten the completion time, it also results in additional operational costs. Keywords : Project management, CPM and PERT method.

References

Arif Rakhmat Ekanugraha. 2016. Evaluasi Pelaksanaan Proyek Dengan Metode CPM dan PERT (Studi Kasus Pembangunan Terminal Binuang Baru Kec. Binuang). Tugas Akhir, Program Studi Teknik Industri, Fakultas Teknologi Industri Universitas Islam, Yogyakarta.

Dewi Taurusyanti dan Muh. Fikri Lesmana. 2015. Optimalisasi Penjadwalan Proyek Jembatan Girder Guna Mencapai Efektifitas Penyelesaian Dengan Metode PERT Dan CPM Pada PT Buana Masa Metalindo. Fakultas Ekonomi, Universitas Pakuan.

Dino Caesaron, Andrey Thio. 2015. Analisa Penjadwalan Waktu Dengan Metode Jalur Kritis Dan Pert Pada Proyek Pembangunan Ruko (Jl. Pasar Lama No.20, Glodok). Journal Of Industrinal Engineering & Management System, Vol. 8, No. 2 August 2015.

Eka Dannayati. 2010. Optimalisasi Pelaksanaan Proyek Dengan Metode PERT dan CPM (Studi Kasus Twin Tower Building Pasca Sarjana Undip). Tugas Akhir ,Jurusan Ekonomi Universitas Diponegoro, Semarang.

Espanda Riez 2016. Tahapan - Tahapan Dalam Proyek Pembangunan., [Online] Tersedia:http://materiarsitektur.blogspot.co.id/2016/04/tahapan-tahapan-dalam-proyek-konstruksi.html [25 November 2018]

Eriskusnadi. 2012. Activity Network Diagram (Bagian Pertama).[Online]. Tersedia : https://eriskusnadi.wordpress.com/2012/03/18/activity network - diagram-part-1/ [30 November2018]

Eriskusnadi. 2012. Activity Network Diagram (Bagian Pertama).[Online]. Tersedia : https://eriskusnadi.wordpress.com/2012/03/18/activity network - diagram-part-1/ [30 November2018]

Herjanto, E. 2008. Manajemen operasi. (3rd ed.). Jakarta: Grasindo.

Irwan Raharja. 2014. Analisa Penjadwalan Proyek Dengan Metode PERT Di PT. Hasana Damai Putra Yogyakarta Pada Proyek Perumahan Tirta Sani. Alumni Program Studi Ekonomi Manajemen, Universitas Islam Indonesia, Jogjakarta.

Muhammad Rizki Ridho & Syahrizal. 2016. Penjadwalan Waktu Dan Biaya Proyek Dengan Metode PERT Dan CPM (Studi Kasus : Proyek Pembangunan Gedung Kantor Badan Pusat Statistik Kota Medan). Tugas Akhir. Jurusan Teknik Sipil. Universitas Sumatra Utara.

Render, Barry & Jay Heizer, 2004. Manajemen Operasi. Salemba Empat. Jakarta.

Soeharto, Iman. 1999. Manajemen Proyek Dari Konseptual Sampai Operasional. Jakarta : Erlangga.

Subagya, 2000. Analisis Manajemen Proyek. Graha Pena. Bekasi.

Yamit. 2000. Manajemen Proyek Kontruksi Edisi Pertama. Yogyakarta.

Downloads

Published

2021-04-01

How to Cite

Suwarni, P. E. (2021). OPTIMALISASI WAKTU DAN BIAYA PROYEK DENGAN METODE CPM DAN PERT DI PROYEK ABC CONDOTEL. Industrika : Jurnal Ilmiah Teknik Industri, 3(1). https://doi.org/10.37090/indstrk.v3i1.125