Implementasi Metode Single Minute Exchange of Dies Untuk Optimasi Setting Time Mesin Flexo B1 Grup C Pada Carton Box Departement PT. A
DOI:
https://doi.org/10.37090/indstrk.v8i2.1275Abstract
PT. A is a company engaged in the production and sale of paper, cardboard boxes, and other similar products in Indonesia. The products it offers include paper, tissue, packaging, and other products. The Carton Box Department, from the results of observations made, the average actual setting time on the Flexo B1 Group C machine is 47 minutes/order, this is one of the weaknesses that causes a 32-minute gap from the target set by the company which is 15 minutes/order. The research objectives are to analyze, improve, and obtain improved setting time results on the Flexo B1 Group C machine and the production process time carried out. The SMED (Single Minute Exchange of Dies) method is one approach that can be pursued in improving setting time. The influence of the SMED (Single Minute Exchange of Dies) method in optimizing the setting time of the Flexo B1 Group C machine results in a decrease in setting time with a setup duration of 49.11 minutes, normal time of 59 minutes, and standard time 66 minutes to a setup duration 25.36 minutes, normal time 27 minutes and standard time 34 minutes and the percentage obtained is 51.8%.
Keywords: Lean Manufacturing, Productivity, Single Minute Exchange of Dies
References
Arief, F. N., & Ikatrinasari, Z. F. (2019a). Perbaikan Waktu Setup Dengan Menggunakan Metode Smed Pada Mesin Filling Krim. Jurnal Ilmiah Teknik Industri, 6(1), 1–8. https://doi.org/10.24912/jitiuntar.v6i1.3015
Arief, F. N., & Ikatrinasari, Z. F. (2019b). Perbaikan Waktu Setup Dengan Menggunakan Metode Smed Pada Mesin Filling Krim. Jurnal Ilmiah Teknik Industri, 6(1), 213–220. https://doi.org/10.24912/jitiuntar.v6i1.3015
Ashmore, C. (2018). Kaizen and The Art Of Motorcycle Manufacture. Engineering Management Jurnal, 11, 211–214.
Azwir, H. H., Wijaya, N. C., & Oemar, H. (2021). Implementasi Metode Single Minute Exchange Of Die Untuk Mengurangi Waktu Persiapan dan Penyesuaian Mold di Industri Polimer. JISI: Jurnal Integrasi Sistem Industri, 8(2), 41. https://doi.org/10.24853/jisi.8.2.41-52
Indah, A., & Rahayu, A. (2020). Implementasi Single Minute Exchange Of Dies (Smed) Untuk Perbaikan Proses Brand Changeover Mesin Focke Dan Protos. Industry Xplore, 5(1), 24–55. https://doi.org/10.36805/teknikindustri.v5i1.905
Mail, A., Alisyahbana, T., Saleh, A., Malik, R., & Sulawesi Selatan, M. (2018). Analisis Produktivitas dengan Metode Objektive Matrix (Omax) pada Cv. Bintang Jaya. 3(2), 48–55.
Mulyana, A., & Hasibuan, S. (2017). Implementasi Single Minute Exchange of Dies (Smed) Untuk Optimasi Waktu Changeover Model Pada Produksi Panel Telekomunikasi. Sinergi, 21(2), 107. https://doi.org/10.22441/sinergi.2017.2.005
Nurrizky, M. F., Septiana, M. A., Machmudin, J., & Syafii, M. (2021). Peningkatan Efisiensi Mesin Cnc Turning Menggunakan Metode Single Minutes Exchange of Dies Di Pt.X. Jurnal Ilmiah Teknologi Infomasi Terapan, 7(2), 94–100. https://doi.org/10.33197/jitter.vol7.iss2.2021.526
Rani, A. M., Kosasih, M., & Sulaiman, R. M. (2018). Upaya Peningkatan Produktivitas Cabin TD Pretreatment Electro Diposition (PTED) Berbasis Model Objective Matrix (OMAX) PT. XYZ. Jurnal Integrasi Sistem Industri, 5(1), 12–17.
Shigeo, S. (1985). A Revolution in Manufacturing: The SMED System. Productivity Press.
Shingo, S. (1989). A Study of the Toyota Production System from an Industrial Engineering Viewpoint. Productivity Press.
Sivakumar, M., Tamizharasi, G., & Kathiresan, S. (2014). Lean manufacturing in carriage building press shop. World Applied Sciences Journal, 29(10), 1333–1340. https://doi.org/10.5829/idosi.wasj.2014.29.10.1439
Summanth, D. J. (2019). Productivity Engineering and Management Industry. Mc Grow-hill Company.
Suparto, & Hidayatulloh, A. A. (2022). ANALISA PRODUKTIVITAS BAGIAN STEEL PIPE MENGGUNAKAN METODE OBJECTIVE MATRIX (OMAX) DAN KAIZEN (Studi Kasus: Departemen Produksi di PT. Dwi Sumber Arca Waja Batam). Jurnal Teknik Industri, 25(2), 25–31. http://univ45sby.ac.id/ejournal/index.php/industri/index
Ukkas, I. (2017). Faktor-Faktor Yang Mempengaruhi Produktivitas Tenaga Kerja Industri Kecil Kota Palopo. Kelola: Journal of Islamic Education Management, 2(2). https://doi.org/10.24256/kelola.v2i2.440
Whitmore, J. (1997). Coaching For Performance (Seni Mengarahkan Untuk Mendongkrak Kinerja). PT Gramedia Pustaka Utama.
Downloads
Published
Issue
Section
License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.