Analisis Beban Kerja Pada Produksi Beton Pracetak Untuk Menentukan Jumlah Kebutuhan Pekerja

Authors

  • Wahyu Rahman Dani Universitas 17 Agustus 1945 Surabaya
  • Jaka Purnama Universitas 17 Agustus 1945 Surabaya

DOI:

https://doi.org/10.37090/indstrk.v8i2.1217

Abstract

Manufacturing company PT. Varia Usaha Beton provides concrete products. On the concrete production line in Gresik, the company makes various types of concrete, one of which is precast concrete. In manufacturing activities, there are problems when carrying out production where there are orders whose production has not been fully realized. Aspects of workload can influence production demand which cannot be realized in its entirety because workers expend too much energy resulting in workers not being optimal and the limited number of workers resulting in demand not being met. To address this problem, researchers conducted a workload analysis on precast concrete production activities for each product and determined the number of workers needed according to production demand. The method used is using working time measurements and the Full Time Equivalent method to analyze workload and determine the number of workers according to the FTE value index. The results obtained after data processing and data calculations were carried out for operators working to produce precast concrete, 13 of which were overloaded and 2 of which were normal. After calculating the need for workers, the workers needed to meet the demand for precast concrete production requires 52 workers from the initial 24 workers.

Keywords: Full-Time Equivalent, Workload, Worker Needs

References

Amelia, Daulay, I. N., & Marpaung, R. J. (2018). ANALISIS BEBAN KERJA FISIK DAN TINGKAT KELELAHAN KERJA SECARA ERGONOMIS TERHADAP KARYAWAN PT. BERKAT KARUNIA PHALA DURI Analysis of Physical Workload and Work Fatigue Level Ergonomics at. In JOM FEB (Vol. 1).

Caesar Bintang, J., & Purnama, J. (2022). ANALISIS PENGUKURAN WAKTU KERJA PADA ALAT PENUANG AIR PROSES MIXING UNTUK MENINGKATKAN KAPASITAS PRODUKSI BATA TAHAN API. In Prosiding Senakama (Vol. 1).

Cahyati, A. Y., & Setyawan, W. (2021). Analisis Optimalisasi Kebutuhan Karyawan Berdasarkan Beban Kerja dengan Metode Full Time Equivalent (Studi kasus: Fakultas Teknik UNSUR). In Seminar dan Konferensi Nasional IDEC.

Candra Dewi, W., Kholid Al-Ghofari, A., & Yani Tromol Pos I Pabelan, J. A. (2020). ANALISIS BEBAN KERJA DENGAN METODE FULL TIME EQUIVALENT (FTE) UNTUK MENENTUKAN KEBUTUHAN OPERATOR PROSES PENGEMASAN KOSMETIK PT. XYZ.

Fathoni, M. I. (2021). PENGARUH BEBAN KERJA TERHADAP PRODUKTIVITAS KERJA KARYAWAN TENAGA NON KESEHATAN DI UNIT PELAKSANA TEKNIS RUMAH SAKIT PRATAMA KOTA YOGYAKARTA TAHUN 2020.

Hudaningsih, N., & Prayoga, R. (2019). ANALISIS KEBUTUHAN KARYAWAN DENGAN METODE FULL TIME EQUIVALENT (FTE) PADA DEPARTEMEN PRODUKSI PT. BORSYA CIPTA COMMUNICA (Vol. 3). Retrieved from http://jurnal.uts.ac.id

Irawati, R., & Carollina, D. A. (2017). ANALISIS PENGARUH BEBAN KERJA TERHADAP KINERJA KARYAWAN OPERATOR PADA PT GIKEN PRECISION INDONESIA.

Madiun, W. S., & Kakerissa, A. L. (2017). ANALISIS BEBAN KERJA KARYAWAN BAGIAN PRODUKSI DENGAN MENGGUNAKAN METODE FULL TIME EQUIVALENT (FTE) DI UD ROTI ALVINE. Agustus, 11(2).

Panji, L., Subekti, N., & Purnama, J. (2017). ANALISA JUMLAH TENAGA KERJA UNTUK MININGKATKAN PRODUKSI ALMARI PADA UD.DIMAS ALUMUNIUM.

Prangawayu, N., Anto, J. L., & Simangunsong, J. Y. (2021). Analisis Kebutuhan Tenaga Kerja Optimal dengan Metode Work Load Analysis (WLA) pada Extruder Technician I di Departemen Produksi (Vol. 1).

Pranoto, L. H., & Retnowati. (2021). ANALISIS BEBAN KERJA Sumber Daya Manusia Perusahaan (III, Vol. 3; sonta drisca Manalu, Ed.). Jakarta Pusat: Penerbit PPM.

Rachman, T., Utara, J. A., Tomang-Kebon, T., & Jakarta, J. (2013). PENGGUNAAN METODE WORK SAMPLING UNTUK MENGHITUNG WAKTU BAKU DAN KAPASITAS PRODUKSI KARUNGAN SOAP CHIP DI PT. SA. In SA Jurnal InovisiTM (Vol. 9).

Supriyanto, E. (2013). “MANUFAKTUR” DALAM DUNIA TEKNIK INDUSTRI (Vol. 3).

Veza, O. (2017). ANALISIS WAKTU STANDAR PELAYANAN DAN PRODUKTIVITAS PEGAWAI MENGGUNAKAN METODE WORK SAMPLING. In Agustus (Vol. 1). JIK.

Azhar, Z., Dan, Y., & Ariyanti, S. (2018). ANALISIS BEBAN KERJA PADA MAINTENANCE BD-CHECK DENGAN METODE FULL TIME EQUIVALENT. In Jurnal Ilmiah Teknik Industri (Vol. 6).

Zadry Hilma, Susanti Lusi, Yulianda Berry, & Jumeno Desto. (2015). ANALISIS DAN PERANCANGAN SISTEM KERJA (I). Padang: Andalas University Press.

Downloads

Published

2024-04-22

How to Cite

Wahyu Rahman Dani, & Jaka Purnama. (2024). Analisis Beban Kerja Pada Produksi Beton Pracetak Untuk Menentukan Jumlah Kebutuhan Pekerja . Industrika : Jurnal Ilmiah Teknik Industri, 8(2), 196–204. https://doi.org/10.37090/indstrk.v8i2.1217