PERENCANAAN KEBUTUHAN MATERIAL PADA PROYEK PEMBANGUNAN DERMAGA DENGAN MENGGUNAKAN MATERIAL REQUIREMENT PLANNING (MRP)
DOI:
https://doi.org/10.37090/indstrk.v3i1.130Abstract
In each project activity management are usually applied that focus on aspects of planning, implementation, and supervision. So that project activities can run smoothly and finish well, there needs to be a plan and control, not only in managerial aspects but also in the engineering structure. Companies engaged in project contracting services can be said to be successful if they can use their time and project costs efficiently and effectively, so that every project confronted can be completed in a timely manner and in accordance with what was planned. In the dock construction project in this study requires a workforce of 24608 hours. And by using Material Requirement Planning (MRP) for material procurement, a schedule or order plan can be produced from the material that arrives on time that has been determined so that project implementation can proceed smoothly according to plan. Keywords: dock construction project, Material requirement Planning, material procurementReferences
Dimyati, Tjutju Tarliah, Operations
Research Model-Model Pengambilan Keputusan. Penerbit Sinar Baru Bandung
Haedar, Tubagus, Prinsip-Prinsip
Network Planning, Gramedia, Jakarta
Koolma A., Van de Schoot C.J.M., Manajemen Proyek, Cetakan Kelima, Penerbit Universitas Indonesia, Jakarta 1988
Levin, Richard I., Kirkpatrik,
Charles A, Perencanaan dan Pengendalian dengan PERT dan CPM, LPPM Balai Aksara, Jakarta, 1982.
Soeharto, Imam, Manajemen Proyek
(Dari Konseptual Sampai Operasional), Jilid2, Edisi 2, Penerbit Erlangga.
Stoner, James F., Management, Fouth
Edition, Prentice Hall International Inc.,USA., 1989
Smith, Spenser B., Computer Based
Production And Inventory Control, Prentice Hall International Icn.,USA, 1989