Usulan Perbaikan Tata Letak Kerja Proses Produksi Lempengan Paku Bumi menggunakan simulasi Promodel (Studi Kasus: PT GCE)
DOI:
https://doi.org/10.37090/indstrk.v8i4.1555Abstract
Increasingly tight competition in the business world encourages organizations to improve the quality of their output. PT GCE, a manufacturing company in the Sheet Metal industry, with output based on employment. In the manufacturing process various obstacles often arise which result in delays in the processing time. To address these issues, they use computer simulations, primarily ProModel, to identify and overcome bottlenecks in resource utilization, production capacity, and inventory levels. This research focuses on PT GCE and queuing problems caused by several production processes, with the author analyzing the use of ProModel to improve production systems and increase performance. As a result of this research, the author made improvements to the production process system in order to increase performance, which can be done by increasing the number of employees or operators on machines where there is a buildup of goods, combining the Welding and Fit Up processes in order to optimize production time and areas as well as bringing work stations closer together with related processes and optimize operator performance so there is no waiting time.
Keywords: Computer Simulation, Factory Layout, ProModel
References
Afiyanti, Y. (2018). Validitas Dan Reliabilitas Dalam Penelitian Kualitatif. Jurnal Keperawatan Indonesia, 137-141.
Agus Riyanto. (2014). Simulasi Sistem Antrian Menggunakan Promodel di RS Hasan Sadikin Bandung. Bandung: Universitas Komputeri Indonesia Bandung.
Apple, J. M. . (1990). Tataletak Pabrik dan Pemindahan Bahan. Bandung: ITB.
Ashari, S. (2005). Analisis Statistik dengan MS.Excel dan SPSS. Yogyakarta: Andi.
Bowden Et. Al,. (2003). Simulation Using Promodel. New York: McGRaw-hill.
Ghozali. (2005). Aplikasi analisis multivariet dengan SPSS. Semarang: Badan Penerbit UNDIP.
Hari, P. (2004). “Pengantar Teknik Industri”. Yogyakarta: Graha ilmu.
Irsa, et al. (2019). Analisis Beban Kerja Fisik Dan Perancangan Kebutuhan Jumlah Pegawai Menggunakan Metode Work Sampling Pada Divisi Human Resource Department Di Pt Pikiran Rakyat Bandung. Telkom University Journal, 32-44.
Latari, H. (2015). Konsep, Teknik dan Aplikasi dengan Menggunakan Smart PLS 3.0 dalam penelitian empiris. Semarang: BP Undip.
Penulis. (2024). Usulan Perbaikan Tata Letak. Karawang: Universitas Singaperbangsa Karawang.
Schriber, T. (1987). The Nature And Role Of Simulation In The Design Of Manufacturing System: Simulation In CIM And Artificial Intelligence. CA : Society For Computer Simulation.
Sugiyono. (2019). Metedologi Penelitian Kualitatif dan Kualitatif Dan R&D. Bandung: Alfabeta.
Wignjosoebroto, S. (2009). Tata Letak Pabrik dan Pemindahan. Surabaya: Guna Widya.
Wignjosoebroto,S. (2017). Ergonomi Studi Gerak dan Waktu. Surabaya: Gunawidya.
Zeki, M. (2014). Perancangan Ulang Tata Letak Pabrik Kilang Kayu CV. Jurnal Tekni Industri Universitas Bung Hatta, Vol. 01 No.02.
Downloads
Published
Issue
Section
License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.