Rekayasa Ulang Lantai Produksi PT. X dengan Metode Systematic Layout Planning

Authors

  • Alif Radzaki Fadilah Universitas Singaperbangsa Karawang
  • Winarno Winarno Universitas Singaperbangsa Karawang

DOI:

https://doi.org/10.37090/indstrk.v9i2.1612

Abstract

PT X is a company that can produce and engineer machine tools engaged as a manufacturer of agricultural, livestock, plantation, and fishery machine tools. The arrangement of the layout of the production facility from the work environment (production floor) greatly affects the production process activities to run well. The increase in productivity of the company is driven by every interested party in it. With the results of these improvements, it will certainly encourage the level of performance, productivity, and quality of the products produced with the minimum possible production costs expected by management. In-depth analysis and evaluation are needed to identify problems and potential improvements in the layout of the production floor. Systematic Layout Planning (SLP) is an approach used in order to optimize material moving costs and mileage to redesign a layout. After optimizing the layout, the results of the current layout have a cost or Material Handling Cost (OMH) of IDR 2,736,750 with a total mileage of 182,45 m. On the other hand, the proposed layout has a total mileage of 175,6 m, resulting in an OMH of IDR 2,634,000. This can prove that there was a decrease in total OMH of IDR 102,750 so that the proposed layout can be applied.

Downloads

Download data is not yet available.

References

Adiasa, I., & Mashabai, I. (2024). Perancangan Ulang Tata Letak Fasilitas Menggunakan Metode Systematic Layout Planning (SLP) Dengan Alogaritma Blocplan Di UD Wijaya Samawa. Industrika : Jurnal Ilmiah Teknik Industri, 8(1), 54–66. https://doi.org/10.37090/indstrk.v8i1.1 081

Adib, J., Momon Subagyo, A., & Sari, R. P. (2023). Perancangan Ulang Tata Letak Pabrik Industri Olahan Rotan PT XYZ di Kabupaten Cirebon Menggunakan Metode Systematic Layout Planning. Jurnal Serambi Engineering, VIII(3).

Afifah, N., & Ngatilah, Y. (2020). Analisis Perancangan Ulang Tata Letak Fasilitas Produksi Dengan Metode Systematic Layout Planning (SLP) Di PT. Elang Jagad. Juminten : Jurnal Manajemen Industri Dan Teknologi, 01(04), 104–116.

Apple, J. M. (1990). Tata Letak Pabrik dan Pemindahan Bahan (3rd ed.). ITB.

Astharina, V., & Suliantoro, H. (2016). Analisis Penerapan 5S+Safety Pada Area Warehouse Di PT. Bina Busana Internusa Group, Semarang. Industrial Engineering Online Journal, 5(4). https://ejournal3.undip.ac.id/index.php

/ieoj/article/view/14078

Hafidin, M. F., & Nugraha, A. E. (2023). Analisis dan Usulan Perencanaan Tata Letak Pabrik Bagian Produksi Menggunakan Metode Systematic Layout Planning (SLP) di PT.ABC. Industrika : Jurnal Ilmiah Teknik Industri, 7(2), 161–171. https://doi.org/10.37090/indstrk.v7i2.9 64

Hartari, E., & Herwanto, D. (2021). Perancangan Tata Letak Stasiun Kerja dengan Menggunakan Metode Systematic Layout Planning. Jurnal Media Teknik Dan Sistem Industri, 5(2), 118–125. https://doi.org/10.35194/jmtsi.v5i2.14 80

Islaha, A. F., & Cahyana, A. S. (2017). Upaya Peningkatan Produktivitas Dengan Meminimasi Waste Menggunakan From To Chart (FTC). PROZIMA (Productivity, Optimization and Manufacturing System Engineering), 1(2), 107–115.

https://doi.org/10.21070/prozima.v1i2. 1289

Julianto, A., Rachmawaty, D., & Yanyan Ramdhani, A. (2023). Perancangan Ulang Tata Letak Fasilitas Lantai Produksi PT. A Menggunakan Simulasi Software Flexsim. Industrika : Jurnal Ilmiah Teknik Industri, 7(2), 153–160. https://doi.org/10.37090/indstrk.v7i2.9 67

Mas Aji Saputra, Dina Rachmawaty, & Halim Qista Karima. (2022). Perancangan Tata Letak Fasilitas Pada UMKM Sepatu “Prohana” menggunakan Systematic Layout Planning. Matrik : Jurnal Manajemen & Teknik Industri Produksi, XXIII(1), 85–98. https://doi.org/10.350587/Matrik

Maskur, A. A., & Andriani, D. (2019). Usulan Perancangan Tata Letak Fasilitas Lantai Produksi Menggunakan Algoritma CRAFT Di Pabrik Alumunium Super (Cap Komodo). Inaque: Journal of Industrial and Quality Engineering, 7(1), 44–52. https://doi.org/10.34010/iqe.v7i1.1732

Mulyani, M., & Santosa, A. (2019). Analisis Dampak Peningkatan Kapasitas Brodo Footwear Terhadap Biaya Relevan Dan Utilitas Station Kerja Di CV Marasabessy Dengan Model Simulasi Kejadian Diskrit. Inaque: Journal of Industrial and Quality Engineering, 7(1). https://doi.org/10.34010/iqe.v7i1.1723

Nurmillati Kamala, I., & Muhardi. (2018). Analisis Perancangan Tata Letak Gedung Pesantren dengan Menggunakan Pendekatan Systematic Layout Planning (Studi Kasus: Pondok Pesantren Pagelaran 3 Cimeuhmal Subang). Prosiding Manajemen, 1090– 1096.

Rachman Rachim, F., & Santosa, A. (2019). Pemodelan Simulasi Untuk Perbaikan Tata Letak Pada Pabrik Spun Pile Di PT Waskita Beton Precast Tbk. Plant Subang Menggunakan Pro-Model. Inaque: Journal of Industrial and Quality Engineering, 7(2), 91–98. https://doi.org/10.34010/iqe.v7i2.1847

Rochman, T., Astuti, R. D., & Patriansyah, R. (2010). Peningkatan Produktivitas Kerja Operator melalui Perbaikan Alat Material Handling dengan Pendekatan Ergonomi. 9(1), 1–10. https://doi.org/10.20961/performa.9.1. 13874

Supriyanto, E. (2020). Manufaktur Dalam Dunia Teknik Industri. Jurnal Industri Elektro Dan Penerbangan, 3(3).

Tompkins, J. A., & White, John. A. (1996). Facilities Planning (2nd ed.). John Willey & Sons.

Wignjosoebroto, S. (2009). Tata Letak Pabrik dan Pemindahan Bahan (4th ed.). ITS.

Downloads

Published

2025-04-14