Perhitungan Overall Equipment Effectiveness (OEE) untuk Mengetahui Efektivitas Mesin Produksi di PT. Z
DOI:
https://doi.org/10.37090/indstrk.v7i2.954Abstract
PT. Z is a company that produces all packaging needs. The problems that exist in the production process are frequent occurrence of breakdowns on machines which result in decreased productivity. This study aims to calculate the Overall Equipment Effectiveness (OEE) value, analyze the six big losses factors, and analyze the root causes of problems from the Imprabox Matt Floor production process. From the results of the calculations that have been done, it is found that the OEE value of the Marking Process is 85.2%, Material Cutting is 68.2%, Material Printing is 75.8%, Printing is 47.9%, Welding Process is 36.6%, Assembly is 74.9% , Process Screw 81.3%. Only the marking process meets World Class OEE with an OEE value of 85.2%, and the smallest OEE value of all production processes is found in the welding process with an OEE value of 36.6%. The results of the Six Big Losses analysis and the root causes of the problem found that the lack of understanding of employees in operating machines is one of the main causes of the low OEE score. From these problems, proposed improvements in an effort to increase OEE are by conducting operator training, scheduling preventive maintenance, making machine checksheets, standardizing the welding process, and checking the machine periodically.
Keywords: Cause and Effect Diagrams, OEE, Productivity, Six Big Losses
References
Azizah, F. N., & Rinaldi, D. N. (2022). Effort to Improve Overall Equipment Effectiveness Performance with Six Big Losses Analysis in the Packaging Industry PT BMJ. IJIEM - Indonesian Journal of Industrial Engineering and Management, 3(1), 26. https://doi.org/10.22441/ijiem.v3i1.13508
J. Alhilman, F. T. D. A. and N. A. (2017). Software application for maintenance system: A combination of maintenance methods in printing industry. International Conference on Information and Communication Technology (ICoIC7), Melaka, Malaysia, 2017.
Mansur, A., Rayendra, R., & Mastur, M. (2016). Performance Acceleration on Production Machines Using the Overall Equipment Effectiveness (OEE) Approach. IOP Conference Series: Materials Science and Engineering, 105(1). https://doi.org/10.1088/1757-899X/105/1/012019
Muhammad, M., Aditya, R., Melani, T., & G, K. I. A. (2022). Pengukuran Overall Equipment Effectiveness ( Oee ) Sebagai Upaya Meningkatkan Nilai Efektivitas Mesin Washer Di Pt . Xyz. Jurnal Taguchi: Jurnal Ilmiah Teknik Dan Manajemen Industri, 2(1), 131–141.
Nugroho, S., & Alfajri, Y. M. (2015). Studi Evaluasi Perencanaan dan Pengendalian Produksi dengan Pendekatan Economic Order Quantity (Eoq) pada Sistem Produksi Meja Lipat Karakter Solo. At-Tauzi: Islamic Economic Journal, 13(2), 30–44.
Nur, M., & Haris, H. (2019). Usulan Perbaikan Efektifitas Mesin Melalui Analisa Penerapan TPM Menggunakan Metode OEE Dan Six Big Los ses Di PT . P & P Bangkinang. Industrial Engineering Journal ISSN 2302 934X, 8(1), 57–67.
Purba, S., Parinduri, L., & Harahap, B. (2021). Penentuan Interval Waktu Preventif Maintenance Pada Mesin Open Top Roller Menggunakan Metode Reliability Centered Maintenance Di Unit Pabrik Teh Kebun Tobasari Pt. Perkebunan Nusantara Iv. Cetak) Buletin Utama Teknik, 16(2), 1410–4520. https://www.researchgate.net/publication/334133555_Penentuan_Interval_Waktu_Preventive_Maintenance_Pada_Nail_Making_Machine_Dengan_Menggunakan_Metode_Reliability_Centered_Maintenance_RCM_II
Sundari, S., & Wahyono, H. (2021). PENGUKURAN PRODUKTIVITAS MESIN TETAS TELUR DENGAN METODE OVERALL EQUIPMENT EFFECTIVENESS (OEE) DI PT. MALINDO FEEDMILL. Tbk. Industrika : Jurnal Ilmiah Teknik Industri, 51–65. https://jurnal.utb.ac.id/index.php/indstrk/article/view/193
SW, B. (2019). ANALISA PERBAIKAN PRODUKTIVITAS MENGGUNAKAN METODE OVERALL EQUIPMENT EFFECTIVINESS (OEE) PADA MESIN FILLING DENGAN PENDAKATAN SIX BIG LOSSES UNTUK MENCARI PENYEBAB LOSSES TERTINGGI PADA PRODUKSI SKINCARE STUDI KASUS PT XYZ. Jurnal Teknik, 8(1), 90–99. https://doi.org/10.31000/jt.v8i1.1596
Wudhikarn, R. (2016). Implementation of the overall equipment cost loss (OECL) methodology for comparison with overall equipment effectiveness (OEE). Journal of Quality in Maintenance Engineering, 22(1), 81–93. https://doi.org/10.1108/JQME-12-2011-0001
Zulfatri, M. M., Alhilman, J., & Atmaji, F. T. D. (2020). Pengukuran Efektivitas Mesin Dengan Menggunakan Metode Overall Equipment Effectiveness (Oee) Dan Overall Resource Effectiveness (Ore) Pada Mesin Pl1250 Di Pt Xzy. JISI: Jurnal Integrasi Sistem Industri, 7(2), 123. https://doi.org/10.24853/jisi.7.2.123-131
Zulwi, D., Tifani, A., Wibowo, H., & Wardana, M. W. (2019). PENDEKATAN OVERALL EQUIPMENT EFFECTIVENESS ( OEE ) DAN SIX BIG LOSSES DALAM MENGUKUR PRODUKTIVITAS MESIN SHEETER DI PT . X. 37–48.
Downloads
Published
Issue
Section
License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.